In the event of an emergency, Travis County crews are out assessing roads and other infrastructure. Monitor this page for most current information as it becomes available.
Current Road Status
Sandy Creek Bridge
Repairs to the Sandy Creek Bridge are underway. Residents should expect construction traffic and noise, nighttime lighting, and be aware of workers in the area.
The temporary low water crossing will remain open during bridge construction.
Please follow all posted signage and drive safely.
Status of other roads not under the jurisdiction of Travis County may be found at atxfloods.com or that jurisdiction's website.
New Pedestrian Path on Round Mountain Rd.
A Travis County contractor has completed a 10-foot-wide asphalt millings pedestrian path between Big Sandy Dr and the Round Mountain Baptist Church. The path will be lit at night and is currently being delineated using construction cones. Those cones will be replaced and upgraded with traffic water barriers. We request the public to remain cautious as the road continues to be a high traffic area.